The epic build of a 1969 Camaro!


Go to content

Sheet Metal Pt. 4 (new pics)

The Build

Prepping frame for the DSE wheel wells:

Before the new DSE wheel wells could be installed, the frame had to be notched and boxed. The rails were trimmed using a cutoff wheel and reciprocating saw. The new pieces were cut from 1/8th inch flat steel. They were heated, shaped and trimmed to fit. (click pictures for a larger view)

Passenger side

Driver side


Back to content | Back to main menu